In construction work, Heavy equipment plays an important role in supporting project productivity. However, before being used every day, Heavy equipment needs to go through a daily pre -operating examination stage (P2H). For those who don't know, P2H is the first step taken to ensure the condition of the device is safe and functioning properly.
This examination includes various important aspects, such as a hydraulic system, was, rem, Ban or Track, as well as other control components. Even though it looks simple, P2H is very influential in the safety of work, prevent unwanted damage, and helps extend the service life of the tool.
By doing P2H consistently, projects can run more efficiently, minimal risk, and heavy equipment remains in optimal condition every day. Read more below!
What is P2H (Daily Pre -Operating Inspection) Heavy Equipment?
P2H (Daily Pre -Operating Inspection) is a routine inspection process that is carried out every day before heavy equipment is used to ensure that the equipment is ready and safe to operate. The aim of this work system is to ensure that all equipment components are in prime condition and safe to use.
What are the processes of heavy equipment P2H? This process includes inspection of important systems such as hydraulics, was, rem, electricity, as well as physical conditions such as tires, track, or description lights. Usually, This inspection is carried out by operators or technicians as part of the daily routine on the project. Even though it looks simple, P2H is essential to prevent technical glitches, of.
P2H Function in Heavy Equipment Operations
Daily Pre -Operating Inspection (P2H) It works as an early step to ensure that the heavy tools are ready to be used securely and optimally every day. By doing P2H, Operators can detect component damage or wear early, so that repairs can be made before the problem grows bigger and disrupts the progress of work. This function is critical to maintaining smooth operations and preventing downtime (downtime) which is undesirable.
Apart from supporting work efficiency, P2H also plays an important role in maintaining work safety in the field. Equipment that has been properly checked will reduce the risk of accidents. P2H also helps extend the service life of heavy equipment because damage can be prevented early.
Benefits of P2H Heavy Equipment for Construction Projects
In construction project, Daily examination of heavy tools (P2H) plays a vital role in supporting work activities in the field. Implementing P2H provides a number of benefits, Among them as follows:
- Increase project productivity
- Assist with periodic maintenance planning
- Makes it easier to identify spare parts needs
- Increases tool reliability in the field
- Supports tool operational logging
- Detect leaks or technical glitches early
What is Checked in Heavy Equipment P2H?
Daily inspection and maintenance (P2H) is an important activity carried out before the heavy equipment is operated. This activity aims to ensure that all tool components are in a safe condition and suitable for use. Even though it looks simple, P2H really helps prevent sudden damage and reduces the risk of work accidents. Here are some things checked in the P2H system.
1. Excavator
- Check engine oil and hydraulic oil
- Check for leaks in the hydraulic system
- Track condition (chain) and the tension
- Check electrical system and battery
- Work light, horn, and alarms
- Indicator panel: temperature, the pressure was, and fuel level
- Cleanliness and condition of the operator's cabin
- Boom and arm rotation system (slewing)
- Condition of bucket and connection pins
2. Bulldozer
- Track shoe condition and chain tension
- Engine oil check, oli hydraulic, and transmission oil
- Blade system: continuation, hydraulic cylinder, and lubrication
- Indicator panel and warning lights
- Braking and clutch systems
- Fuel inspection and possible leaks
- Work light and horn function
- Radiator cooling system
- Electricity and battery
3. Wheel Loader
- Tire condition (wind pressure and wear)
- Engine oil check, transmission oil, and hydraulic
- Braking and steering system
- Indicator panels and measuring instruments (fuel gauge, oil pressure)
- Bucket condition, linkage, and pins
- Headlights, reverse light, as well as the horn
- Electrical system: aki, cable, and connectors
- Inspection of fuel system
- Operator's cabin: glass, wiper, and seat belts
4. Dump Truck
- Tire pressure and condition
- Engine oil check, rem, and power steering
- Braking system (main and parking brakes)
- Headlights, rem, be, and horn
- Indicator panel: engine temperature, the pressure was, fuel
- Body hydraulic system (dumping)
- Check for fuel and oil leaks
Who is Responsible for Carrying Out P2H?
Daily Inspection and Maintenance (P2H) heavy equipment is a shared responsibility involving several parties in the field. Everyone has their own role to ensure that heavy equipment remains safe and ready for use. This is the person involved in the implementation of P2H:
- A heavy tool operator
A heavy tool operator Serving in the initial inspection before the tool is used. They check the physical condition of the equipment, was, light, indicator, and ensure there are no leaks or visible damage.
- Technician or mechanic
If the operator finds a problem during checking, heavy equipment technician or mechanic will handle further inspections and carry out repairs or replacement of components if necessary.
- Project foreman or supervisor
The foreman or supervisor ensures that the P2H checklist has been filled in correctly and the tools are in a usable condition before starting work. They also monitor the implementation of P2H as a whole.
Example of Heavy Equipment P2H Form
P2H Form (Daily Inspection and Maintenance) serves as a guide as well as written proof that the heavy equipment has gone through an inspection process before use. This form contains a list of components that must be checked by the operator, complete with column for ticking, condition note, as well as signatures. Below is an example form that you can see.
| No | Inspection Items | OK ✔ | Broken ✖ | Information | TTD Operator |
| 1 | Was Mesin | ||||
| 2 | Air radiator | ||||
| 3 | Battery & terminal connection | ||||
| 4 | Braking system | ||||
| 5 | Headlights & back | ||||
| 6 | Horn | ||||
| 7 | Body a welcome |
Want a Strike Tool Free Project? PSU is Ready to Provide Heavy Equipment with Guaranteed P2H
After knowing the discussion about the importance of P2H for heavy equipment, Who doesn't want their work to run smoothly?? Just trust me PT Perkasa Sarana Utama (PSU) As a heavy tool vendor. Every unit of heavy equipment rented has gone through daily inspection and maintenance (P2H) routinely and strictly before being sent to the work site.
The team of PSU operators and technicians carries out thorough checks on important parts, starting from the machine, hydraulic system, rem, to electricity, to ensure the tool is ready for use without the risk of sudden damage. This procedure is part of our commitment to provide the best service and keep your project productivity optimal.
You can order online without having to come to the location. Consult your project needs with our expert team via WhatsApp at 0811-358-378 or send an email to rent@psualatberat.com. Don't forget to follow our Instagram on @psualatberat to get the latest updates, project tips, and various other attractive offers. PSU is ready to support your project, anytime and anywhere.